Have a question? Call/Text 918-720-7802 for immediate assistance!

HDPE/MDPE Quick Guide - Manual Fusion (Step 1 of 7)

Posted by Ben Murphy on

  1. Inspect, Clean & Install Pipe
  • INSPECT machine and pipe.
  • Review HEAT SOAK time, BEAD SIZE, OPEN/CLOSE time, and COOLING time.
  • CLEAN inserts and pipe.
  • Install and clamp pipe. If pipe ends are fairly even, check ALIGNMENT.

Share this post



← Older Post Newer Post →