Have a question? Call/Text 918-720-7802 for immediate assistance!

HDPE/MDPE Quick Guide - Manual Fusion (Step 3 of 7)

Posted by Ben Murphy on

  1. Prepare Heater
  • Review FUSING parameters.
  • Ensure the pipe does not slip through the jaws at FUSING force.
  • Check the heater TEMPERATURE and CLEAN heater surfaces.
  • Set the heater into the machine between pipe ends.

Share this post



← Older Post Newer Post →