Have a question? Call/Text 918-209-9011 for immediate assistance!

HDPE/MDPE Quick Guide - Manual Fusion (Step 5 of 7)

Posted by Ben Murphy on

  1. Heater Removal & Pipe Inspection
  • When appropriate bead size is observed, open the carriage and REMOVE the heater.
  • Leave the LOCKING CAM engaged during heater removal.
  • INSPECT the pipe ends for condition of the melt.

Share this post



← Older Post Newer Post →