News
Plasson USA Compression Fittings
Posted by Ben Murphy on
- Tags: Compression Fittings, Plasson
McElroy DataLogger 7
Posted by Ben Murphy on
- Tags: Datalogger
HDPE/MDPE Quick Guide - Manual Fusion (Step 7 of 7)
Posted by Ben Murphy on
Open Jaws & Inspect Fusion Disengage the LOCKING CAM. Loosen the jaws, open the carriage, and INSPECT the fusion. If using a TORQUE WRENCH and TORQUE WRENCH ADAPTER, refer to the machine Operator’s Manual for specific instructions during the fusion process.
- Tags: Fusion
HDPE/MDPE Quick Guide - Manual Fusion (Step 6 of 7)
Posted by Ben Murphy on
Fuse & Cool Close the carriage quickly and smoothly with enough FUSING force to roll both melt beads over so that they touch the piping component OD surfaces. Hold FUSING force for 10 SECONDS, then the LOCKING CAM will hold that jaw position. (For the 2CU, hold FUSING force for the entire COOLING time.) Leave the LOCKING CAM engaged until COOLING time is complete.
HDPE/MDPE Quick Guide - Manual Fusion (Step 5 of 7)
Posted by Ben Murphy on
Heater Removal & Pipe Inspection When appropriate bead size is observed, open the carriage and REMOVE the heater. Leave the LOCKING CAM engaged during heater removal. INSPECT the pipe ends for condition of the melt.